Get solutions that meet your industry's specific needs
UEN No: 201020108C
Discover our story through our diverse portfolio and follow our journey through the eyes of our people. commits to do our best as a major player in the industry to challenge the norms in order to set higher standards in all aspects of construction.
Oil & Gas Plant
This type of plant processes raw natural gas to remove impurities such as water, sulfur, carbon dioxide, and other hydrocarbons like propane and butanes.
Construction
Industrial construction refers to the building of factories, power plants, refineries, and other heavy industrial facilities, These projects often involve specialized equipment.
Transport & Logistics
Freight transportation involves the movement of goods and cargo from one location to another using various modes of transport, including trucks, trains, ships.
Your Choice for Quality Works and Finishes
We operate to internationally recognised and certified standards
Team Members
+
Projects Completed
+
Years of Experiences
+
Worldwide Branches
+
We deliver a comprehensive scope and range of end-to-end industry specific solutions
UEN No: 201020108C
Your Choice for Quality Works and Finishes
Since 2010 its incorporation in , Oyang Engineering Pte Ltd provides a complete spectrum of services ranging from construction planning to contracting projects to transportation of earth and construction materials for both public and private companies. In recent years, Chye Joo Construction has been diversifying its portfolio of services to include the contracting of specialized civil engineering projects.
Over the years, we have gained expertise and extensive experience in various fields of civil engineering. Our dedication has enabled us to build robust and trustworthy relationships with both clients and partners. We remain steadfast in our commitment to enhance and contribute to the development of Singapore’s built environment.
our commitment to enhance and contribute to the development of Singapore’s built environment.
Discover our Projects
Over the years, we have gained expertise and extensive experience in various fields of civil engineering. Our dedication has enabled us to build robust and trustworthy relationships with both clients and partners.

Tampines North EC
Residential
Tampines North EC
| LOCATION: | Tampines Street 62 |
| TYPE: | Residential |
| CLIENT: | TQS Development Pte. Ltd. |
| CONTRACT VALUE: | $185.7 Mil |
| COMPLETION DATE: | Ongoing |
About The Project


HTL Factory
Industrial
New HTL Factory
| LOCATION: | Gul Circle, Singapore |
| TYPE: | Building (Industrial) |
| CLIENT: | Hwa Tat Lee Manufacturing Pte Ltd |
| CONTRACT VALUE: | S$ 25.80 Million |
| COMPLETION DATE: | Apr 2028 |
About The Project
Hwa Tat Lee (HTL) Factory is a two-storey industrial building and one-storey basement project as an extension to the existing Design Development Centre & Ancillaries located at Gul Circle.

Cyberhub
Industrial
Cyberhub
| LOCATION: | Bendemeer Road, Singapore |
| TYPE: | Building (Industrial) |
| CLIENT: | Cyberhub Holdings Pte Ltd |
| CONTRACT VALUE: | S$21.60 Million |
| COMPLETION DATE: | Dec 2026 |
About The Project
Cyberhub is a seven-storey industrial building with basement carpark situated along Bendemeer Road. It was constructed for warehouse and office usage. The project was awarded the Certificate of Merit for Safety Performance Award, and attained a high CONQUAS score of 75.6 points.
Port Maintenance Dredging
Civil Engineering
Port Maintenance Dredging
| LOCATION: | Pasir Panjang Terminal, Singapore |
| TYPE: | Civil Engineering |
| CLIENT: | PSA Corporation Pte Ltd |
| CONTRACT VALUE: | S$4.66 Million |
| COMPLETION DATE: | Jan 2027 |
About The Project
Unlike conventional dredging operations, maintenance dredging is highly challenging due to the stringent requirement in dredging design depths. Having an allowable tolerance of only fractions of a metre, such operations by massive vessels are required to be carried out with immense care to avoid any over-dredging. The fact that it is carried out in one of the world’s busiest ports heightened the difficulty level of project planning and execution. Maintenance dredging was carried out in an area of 280ha in Pasir Panjang Terminal within 9.5 months. State-of-the-art hydrographic survey equipment was adopted to address the strict hydrographic survey requirements set out by the client. Enhancement to our vessels’ depth sensory equipment enabled our team to perform maintenance dredging within the terminal up to the required accuracy. This allowed an economical and efficient dredging and dumping operation to be carried out, delivering the project within budget and on time.

Ayer Chawan Basin
Civil Engineering, Marine & Coastal
Marina East Staging Ground
| LOCATION: | Marina East Drive, Singapore |
| TYPE: | Civil Engineering, Marine & Coastal |
| CLIENT: | Land Transport Authority |
| CONTRACT VALUE: | S $99.30 Million |
| COMPLETION DATE: | Sep 2027 |
About The Project
Marina East Staging Ground (MESG) is a support facility for Land Transport Authority (LTA) projects all around Singapore to deliver excavated materials to the staging ground to be used as infill materials for land reclamation. This helps to reduce the dependency of sand required for conventional infilling works. Materials are weighed, discharged directly into barges and then sent to their designated dumping sites. The LTA projects include but not limited to, MRT Tunnelling, Stations, Flyover and Depots. The team’s display of innovation throughout the project has contributed significantly to the success of MESG. Besides being the first in Singapore to introduce the direct discharged platform at the staging ground, MESG is also the only project then in Singapore approved to use Recycle Construction Concrete with Bricks (RCCB) – green material – as a fill material for the construction of T-bund.

Marina East Staging Ground
Civil Engineering, Marine & Coastal
Marina East Staging Ground
| LOCATION: | Marina East Drive, Singapore |
| TYPE: | Civil Engineering, Marine & Coastal |
| CLIENT: | Land Transport Authority |
| CONTRACT VALUE: | S $99.30 Million |
| COMPLETION DATE: | Sep 2027 |
About The Project
Marina East Staging Ground (MESG) is a support facility for Land Transport Authority (LTA) projects all around Singapore to deliver excavated materials to the staging ground to be used as infill materials for land reclamation. This helps to reduce the dependency of sand required for conventional infilling works. Materials are weighed, discharged directly into barges and then sent to their designated dumping sites. The LTA projects include but not limited to, MRT Tunnelling, Stations, Flyover and Depots. The team’s display of innovation throughout the project has contributed significantly to the success of MESG. Besides being the first in Singapore to introduce the direct discharged platform at the staging ground, MESG is also the only project then in Singapore approved to use Recycle Construction Concrete with Bricks (RCCB) – green material – as a fill material for the construction of T-bund.
Oyang Engineering Pte Ltd is also registered under the following tendering limit:
Our Key COMPETENCIES services Company
CW02 Civil Engineering A1
CW01 General Building B1
CR03 Demolition Single Grade
CR05 Concrete Repairs L1
Specialist Builder (Piling Works)
Specialist Builder (Structural Steelwork)
Approved Scaffold Contractor
Sign up and subscribe to our newsletter
We respect your privacy and do not tolerate spam








